Revesby
|
|
---|---|
Airport & East Hills Line | |
Station code | RSY |
Suburb | Revesby |
Street(s) | Blamey Street |
Distance from Central Station | 20.96 km |
Altitude (above sea level) | 4 m |
Types of stopping trains | Suburban all stops Suburban limited stops |
Number of platforms | 3 |
Number of tracks | 3 |
Platform arrangement | 2 island |
Type of station | Ground |
Ticket barriers | No |
Transfers available | Bus |
Disabled access | Yes |
Station facilities | Link |
Revesby railway station is the main intermediate terminus on the Airport & East Hills line of the CityRail network. It services the Sydney suburb of Revesby. Revesby has an island platform and a side platform. It is serviced by both all-stations and faster limited-stop trains. An additional island platform and new footbridge were built as part of the Rail Clearways upgrade, which allows Easy Access for wheelchairs via lifts.
Contents |
Revesby railway station opened with the rest of the East Hills Line in December 1931.[1] The original configuration was an island platform served by a single track. The line was electrified in 1939. In 1956 a crossing loop was opened. It was not until 1987 that the line was fully duplicated through Revesby, in association with the construction of the extension from East Hills to the Main South Line at Glenfield.
Construction of a second island platform commenced in 2006 as part of the CityRail Clearways Project. One of these platforms opened in 2008, providing through services to the west. The existing platform 2 became a centre turnback with only a few services initially using the facility.[2] In October 2009 the timetable changed, and Revesby replaced East Hills as the major intermediate terminus.
Stage 2 of the project will see quadruplication of the tracks between Kingsgrove and Revesby. This will include the opening of the second new platform, with platform 3 becoming a second turnback. When complete, express trains will travel via the new tracks and reach the City via Sydenham.[3] Revesby's four platforms will allow passengers to interchange between the all-stations and express trains. The Clearways Project is due to be complete by 2014.
The station is served by four to six trains per hour each way, with additional trains during weekday peak hours.
Platform | Line | Stopping Pattern | Notes |
Airport & East Hills Line | All stations and limited stops services to Central and the City Circle via the Airport or Sydenham | Inbound (Up) Fast & Through | |
Airport & East Hills Line | Terminating services, returning as all station and limited stops services to Central and the City Circle via the Airport or Sydenham | Turnback platform | |
Airport & East Hills Line | All stations and limited stops services to Glenfield, Campbelltown and Macarthur via East Hills | Future 2nd turnback platform | |
under construction | Future all stations and limited stops services to Glenfield, Campbelltown and Macarthur via East Hills | Future Outbound (Down) Fast & Through |
Veolia Transport runs three routes via Revesby railway station:
NightRide runs one route via Revesby railway station:
Preceding station | CityRail | Following station | ||
---|---|---|---|---|
towards Macarthur
|
Airport and East Hills Line |
towards Central
|